water for injection, vapor compression, water purification, pure steam, usp purified waterwater for injection, vapor compression, water purification, pure steam, usp purified water


 



For every project, Engineering is responsible for planning the design. Engineering establishes a design plan by identifying design activities and assigning responsibilities for the design tasks. This planning includes:

  • Scheduling performance of the required design and development tasks in coordination with Project Management.


  • Assigning responsibility for implementation of required tasks to qualified personnel equipped with adequate resources.


  • Defining verification and validation methods appropriate to each design and development stage.


  • Defining control, organization and technical interfaces between appropriate departments and with the customer.


  • Establishing a design schedule that includes design review activity and updates as the design progresses.


 


 

Planning

Inputs & Outputs

Review

Verification

Validation

Control of Design & Development Changes

 


  



Contact Us  |  Site Map  |  Terms & Conditions  |  Privacy Policy  |  MECO.com  |  Employment  |


12505 Reed Road, Suite 100, Sugar Land, TX 77478
281.276.7600 (p) 800.421.1798 281.313.0643 (f)

© 2004 MECO, All Rights Reserved. This website requires Flash. Click Here if you don't have Flash.