Situation

|
|
|
|
- A large medical device manufacturer required substantial amounts of Purified Water for rinsing and WFI.
- The construction manager received bids from several firms for the production, storage and distribution system.
- This multimillion dollar project was one of the largest in the industry, and the bids received were substantially over the client's budget.
- A fast-track installation was required.
|
|
|
|
|
|
|

Solution

|
|
|
|
- MECO evaluated the project and was able to value engineer the design to reduce capital costs by over $1,000,000.
- Our team delivered the total solution for the production, storage and distribution system including the design, construction, installation and validation of the system.
- MECO's Vapor Compression technology eliminated the need for certain pretreatment components.
- In addition, our use of UPCORE packed-bed softening substantially reduced the quantity of reject water and brine regenerant.
|
|

click here to enlarge.
|
|
|
|
|
|

Benefit

|
|
|
|
- MECO's experience, responsiveness and broad base of technologies allowed the client to quickly assess the cost and benefits of various features of the plant.
- The project was completed below original projections.
- The plant was up and running within the necessary timeframe.
- It featured state-of-the-art technology implemented by MECO.